|
Home
|
![]() |
Sponsored by: |
|
|
MEI Online: Comminution: Latest News: May 1st 2003 |
|
:: Another first in China Within the past quarter of the current year, Loesche signed four contracts with various Chinese customers for the supply of three grinding plants for granulated blast furnace slag and one plant for cement raw material. For Anning (Yunnan Huayun Industrial Corp.) and Maanshan (Anhui Masteel K. Wah New Building Material Co. Ltd.), Loesche will supply two LM 46.2+2 S, each with a capacity of 90 t/h. A Loesche mill type LM 56.2+2 with 4.300 kW drive capacity will be supplied to Neijiang, Sichuan (Chong Long Co. Ltd. of Sichuan). This plant will have a capacity of 140 t/h at 4.500 cm²/g. For this fast track project, Loesche guarantees a delivery time of only six months on FOB-basis. An LM 56.4 for raw material grinding will be supplied to Luzhu (Zhejiang Jianfeng Dencheng Cement Co. Ltd.). The mill has a capacity of 380 t/h raw meal at a fineness of 15 % R 80 µm. This mill is one of the biggest cement raw material mills installed in China and emphasizes Loesche's leadership in the design and manufacture of the biggest vertical roller mills in the world.
|
|
|
© 1998-2007, Minerals Engineering International Email: amanda@min-eng.com |