Home |  News |  Conferences |  Commodities |  Publications |  Business Directory |  Resources |  Help
Go to the MEI Online homepage Sponsored by: Click to go to the Holman-Wilfley website  
Search Site:

MEI Online: Plant Operation News: Europe: March 7th 2006

 
 

Click for more info on Comminution '18

  

:: CPT secures contract with Mikhailovsky Iron Ore

Canadian Process Technologies Inc. a Delta B.C. based company that designs and manufactures mineral processing equipment has been awarded a $3.5 million contract for the supply of column flotation cells, gas spargers associated process control instrumentation for Mikhailovsky Iron Ore in Russia.

The objective of the Mikhailovsky Iron Ore project was to enhance and refine the existing flotation circuit in order to produce a DRI grade magnetite concentrate with less than 3 percent silica. The existing processing plant, operating at 2.0 MTPY, produced a concentrate with a silica content ranging from 6 to 8 percent.

CPT was required to supply two (2) complete cleaning modules to the existing processing circuit including; basic engineering, design, equipment supply, automation control systems and, as well, the provision for further future modular expansion to the circuit.

In phase one, of a four phase project, CPT will supply eight (8) flotation columns the largest of which is 4.3 meters in diameter and 12 meters in height, plus 160 SlamJetŪ spargers complete with associated plant control instrumentation and water conditioning equipment.

 

 

   

Select the list(s) you'd like to join below, enter your email address, choose a content format and click "Join."
[more info]


MEI Online Update
MEI Online Job Vacancies

HTML Text

© 1998-2017, Minerals Engineering International


Email: amanda@min-eng.com