Home |  News |  Conferences |  Commodities |  Publications |  Business Directory |  Resources |  Help
Go to the MEI Online homepage

 
Search Site:

MEI Online: Plant Operation News: North America: July 9th 2002

 
 

click to find out about MEI Conferences

  

:: Newmont Install ConSep ACACIA Reactor

The first North American installation of a ConSep ACACIA Reactor went online this month at Newmont's Golden Giant Mine. After only one trial run, the ACACIA system permanently replaced the shaking table circuit to maximize gold recovery from the high-grade gravity concentrates produced from existing batch-type Knelson Concentrators.

 

Golden Giant Metallurgist Gerry Barstad, who performed the original lab scale and pilot test work on the ACACIA unit, spearheaded the project.

"We had a very high comfort level with the ACACIA Reactor since we've done extensive testing with the Acacia 50 pilot plant prior to ordering the unit," said Barstad.

"Results from the full scale unit were very impressive from the start and were right in line with our expectations from the pilot program. Our goal now is to optimize the unit and maximize our gravity recovery," added Barstad.

 

The ACACIA's first week of production produced an average gold recovery of 99% from Golden Giant's Knelson Concentrators.

The ConSep ACACIA Reactor is a patented, high-efficiency leaching system exclusively designed to handle the high-grade concentrates produced by Knelson Concentrators. The system is designed to maximize gold recovery from gravity concentrates and provide numerous process advantages over a conventional gold room.

 

 

   

Click for more info on Comminution '18

Select the list(s) you'd like to join below, enter your email address, choose a content format and click "Join."
[more info]


MEI Online Update
MEI Online Job Vacancies

HTML Text

© 1998-2017, Minerals Engineering International


Email: amanda@min-eng.com