Home |  News |  Conferences |  Commodities |  Publications |  Business Directory |  Resources |  Help
Go to the MEI Online homepage

 
Search Site:

MEI Online: Plant Operation News: South & Central America: December 5th 2012

 
 

click to find out about MEI Conferences

  

:: SNC-Lavalin Led Joint Venture Awarded Contract for Cobre Panama Process Plant

 

A joint venture led by SNC-Lavalin International Co. Inc., a member of SNC-Lavalin Group Inc., and including GyM S.A. and Techint International Construction Corp, has been selected by Minera Panama S.A. (MPSA), a subsidiary of Inmet Mining Corporation of Canada, to proceed with detailed engineering, procurement and construction of the process plant at the Cobre Panama project in Panama.

The engagement will be performed in two phases. Under the first phase, the joint venture has been instructed to proceed with the detailed engineering and procurement of the plant. In the fourth quarter of 2013, upon satisfactory advancement of detailed engineering, the joint venture will be instructed to proceed with the construction of the facility.

The process plant will be designed to treat a nominal throughput of 160,000 tonnes per day using two grinding lines, each with a capacity of 80,000 tonnes per day. The ore feed rate is expected to increase to 240,000 tonnes per day after the ninth year of operation, allowing MPSA to maintain concentrate production levels despite a falling head grade.

“We are very pleased with the confidence that Inmet continues to demonstrate in our commitment to their project," said Dale Clarke, Executive Vice-President, SNC-Lavalin Group Inc. “SNC-Lavalin has industry leading expertise in the copper sector, and we are proud to put it to work for Inmet at their world-class Cobre Panama mine."

The detailed engineering and procurement of equipment for the process plant has begun. The Cobre Panama project is scheduled to be operational in 2016 and is expected to have a life of approximately 30 years.

The SNC-Lavalin-led joint venture was awarded the infrastructure component of the project earlier this year.

 

 

   

Click for more info on Comminution '18

Select the list(s) you'd like to join below, enter your email address, choose a content format and click "Join."
[more info]


MEI Online Update
MEI Online Job Vacancies

HTML Text

© 1998-2017, Minerals Engineering International


Email: amanda@min-eng.com