| 
  
Home  
 | 
![]()  | 
| 
 MEI Online: Commodities: Metallic Ores: Gold: Latest News: May 1st 2008  | 
| 
 :: Three Deswik 2000 Mills Ordered for Vasilkovsky Gold Project Deswik Mining Consultants have been awarded a multi mullion US dollar contract to manufacture and commission three Deswik 2000 fine grind mills for the Vasilkovsky gold project in Kazakhstan. The Deswik mills will form part of a Leachox processing circuit as designed and supplied by Maelgwyn Mineral Services. The Deswik's have been designed to fine grind the gold sulphide concentrate feed of D95 45um to D90 4um at a production rate nineteen dry tons per hour utilizing 14.81 kWh/t for each of the mills. The three mills will manufactured at Deswik Mining Consultants facility in Germiston South Africa and be ready for shipping to site nineteen weeks after the placement of order. Installation and commissioning is expected to be completed and handed over to the client by October of this year. 
 Contact: 
  | 
| 
 © 1998-2021, Minerals Engineering International Email: amanda@min-eng.com  |