| 
  
Home  
 | 
![]()  | 
| 
 MEI Online: Commodities: Metallic Ores: Gold: Latest News: April 24th 2019  | 
| 
 :: Para Resources Announces a Successful Test Pour of Gold at the Gold Road Mine 
 Para Resources Inc. is pleased to announce the successful testing of the full CIP circuit at Gold Road Mine in Oatman, AZ, including a test pour of gold. A forty ounce doré bar was poured on March 11th, 2019 from the initial carbon strips after the entire plant was balanced. The full circuit of mining, crushing, grinding, leaching, electrowinning, and smelting has now been fully tested and is operational. The ramp up of underground mining continues with full production expected in the 3rd Quarter 2019. Ian Harris, President of Para Resources stated, “The initial doré bar is concrete evidence that the entire mining cycle from mine to plant to smelting is working successfully and puts the Gold Road Mine operation on a solid base to ramp up to full capacity and meet the start-up schedule. We can now focus attention on mine development, adding additional mining faces to reach our goal of 3,000 + ounces per month, expected by the 3rd Quarter 2019.” 
 
  | 
 | 
| 
 © 1998-2021, Minerals Engineering International Email: amanda@min-eng.com  |