Home
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
![]() |
![]() |
MEI Online: Commodities: Metallic Ores: Lithium: Latest News: January 12th 2017 |
![]() |
![]() |
![]() |
![]() :: Lithium to be Extracted from SAGD Oil Sands Wastewater
MGX Minerals Inc reports that the company has successfully extracted lithium from heavy oil wastewater. Results are part of an ongoing optimisation for completion and deployment of a pilot plant in support of its 487,000 ha Alberta lithium project. The company owns a patent pending process (United States Provisional Patent #62/419,011) for the extraction of lithium and other valuable minerals from oil brine. This technology is the first of its kind, reducing production time of lithium from brine by 99% compared with conventional lithium brine production times that use solar evaporation. Process time is reduced from approximately 18 months to 1 day using MGX’s process. Heavy oil evaporator blowdown wastewater (EBD) is one of the byproducts of steam assisted gravity drainage (SAGD) during production of heavy oil. EBD was specifically targeted as the wastewater contains mid-level concentrations of lithium and has the potential to generate high environmental revenue based on current disposal costs. MGX and PurLucid Treatment Solutions are working to integrate their respective technologies and develop a pilot plant suitable for commercial use that will treat EBD to provide oil sand producers with additional environmentally-friendly disposal options as well as recover valuable minerals such as lithium. As reported by Dr Preston McEachern of PurLucid:
MGX and PurLucid have agreed to extend their investment schedule by 30 days pending receipt of a grant application decision. A final decision on the application may be imminent and both parties have agreed to delay crystallising the acquisition valuation for 30 days. MGX will continue to fund development under its engineering and integration agreement with PurLucid whereby PurLucid has been engaged by MGX to optimise and construct a pilot plant for its lithium extraction process and integrate this system with PurLucid’s patented filtration systems for the removal of residual oil from production wastewater. The front-end water treatment portion of the pilot plant is complete and, upon completion of optimization testing, the mineral extraction system will be integrated and deployed. Under the terms of the Investment Agreement, MGX has the right to acquire up to 100% of PurLucid.
|
![]() |
![]() |
© 1998-2021, Minerals Engineering International Email: amanda@min-eng.com |
![]() |